§ 1135. Stream channel protection.  


Latest version.
  • Protection of stream channels from bank and bed erosion and degradation shall be provided by using all of the following three approaches:

    (a)

    Preservation, restoration and re-vegetation or re-forestation using native plant species of the applicable stream buffer;

    (b)

    Twenty-four-hour extended detention storage of the one-year, 24-hour return frequency storm event (this requirement may be adjusted or waived by Jackson County for sites that discharge directly into larger streams, rivers, wetlands, or lakes, or to a man-made channel or conveyance system where the reduction in these flows will not have an impact on upstream or downstream stream bank or channel integrity); and

    (c)

    Erosion prevention measures, such as energy dissipation and velocity controls.

(Ord. No. 17-003 , § 1, 10-2-2017)