§ 3-034. Concrete batching plant, temporary, on-site.  


Latest version.
  • Upon application, the director of public development may authorize a temporary concrete batching plant (manufacturing of concrete) to be established on a site in General Industrial (GI) or Heavy Industrial (HI) zoning districts where a building permit has been issued by the county for an industrial building involving concrete construction, if the application demonstrates compliance with the requirements of this section.

    (a)

    Minimum site area. The minimum site area for establishment of the temporary batching plant shall be five acres.

    (b)

    Plan approval. The location of the batching plant and any associated wash out area must be shown on soil erosion and sedimentation control plans that have been approved by the county as local issuing authority.

    (c)

    Operation. Hours of operation may be limited by the public development director depending on impact on surrounding properties and land uses.

    (d)

    Lighting. If the plant is approved to operate during darkness and lighting of the site is proposed, the application for a temporary, on-site batch plant shall include information regarding lighting of the work area, which is subject to approval of the public development director.

    (e)

    Setback. A minimum 1,000-foot setback from any residential zoning district boundary or public school or park shall be required.

(Ord. No. 17-003 , § 1, 10-2-2017)