§ 3-103. Relocated residential structure.  


Latest version.
  • A site-built single-family dwelling or manufactured home may be relocated onto a lot in unincorporated Jackson County, subject to compliance with the following requirements:

    (a)

    Permit. A building permit shall be required to establish the dwelling in its proposed location. The permit application shall include the address and tax parcel number where the structure is now located and a photograph of the dwelling in its current location.

    (b)

    Water and sewer or septic tank. The lot on which the dwelling is to be located must have adequate water and sanitary sewer or on-site sewage management system (e.g., septic tank) approved by the Jackson County Environmental Health Department prior to occupancy.

    (c)

    Standards. The dwelling shall meet all requirements of section 3-048 of this UDC, no later than six months of issuance of a permit to relocate the dwelling in unincorporated Jackson County and prior to occupancy.

(Ord. No. 17-003 , § 1, 10-2-2017)