§ 2056. Electrical.  


Latest version.
  • (a)

    Underground inspection: To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place.

    (b)

    Rough-in inspection: To be made after the roof, framing, fireblocking, and bracing is in place and prior to the installation of wall or ceiling membranes.

    (c)

    Final inspection: To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy.

(Ord. No. 17-003 , § 1, 10-2-2017)